top of page
Writer's pictureeop pestcontrol

HOW TO DO TERMITE TREATMENT BEFORE BUILD A NEW HOUSE ?Termite Treatment for pre construction

Termite Treatment for pre construction Completing a comprehensive termite treatment before building a new house is crucial to prevent future termite infestations and protect the structural integrity of your home. Here's a step-by-step guide to help you through the process:

1.Pre-Construction Inspection: Hire a licensed pest control professional to conduct a thorough termite inspection of the construction site. This will identify any existing termite activity and help determine the most suitable treatment methods. Termite Treatment for pre construction


2.Soil Treatment: The most common pre-construction termite treatment is soil treatment with termiticides. This involves creating a chemical barrier in the soil around the foundation to repel or eliminate termites.

a. Trenching and Treating: A trench is dug around the perimeter of the building site, and the soil is treated with a liquid termiticide. The termiticide is mixed according to manufacturer instructions and applied as per industry standards.

b. Backfill Treatment: After the trench is treated, the soil is backfilled, ensuring the treated soil is in contact with the foundation. This helps create a continuous barrier.

c. Slab Penetration Treatment: If the house will have a concrete slab foundation, termiticide can be applied before the slab is poured. This treats the soil beneath the slab, preventing termites from coming up through cracks.

hand wood

3.Wood Treatment: Any wood used in the construction should be treated with appropriate termite-resistant chemicals. This includes wooden framing, beams, and other structural elements. 4.Termite-Resistant Building Materials: Consider using termite-resistant materials for parts of the building that are in direct contact with the ground, such as foundation walls. Steel, concrete, and pressure-treated wood are examples of such materials.

new construct

5.Regular Monitoring: Even with pre-construction treatment, it's important to have a monitoring plan in place. Regular termite inspections should be conducted during and after construction to catch any signs of termite activity early.



termite treatment

6.Post-Construction Treatment: After the house is built, you might consider additional termite treatment methods such

as installing termite bait stations around the property. These stations contain bait that termites carry back to their colonies, effectively eradicating them.


7.Follow Regulations and Recommendations: Make sure to comply with local building codes, regulations, and industry standards for termite prevention. Different regions might have specific requirements for termite treatments.

8.Professional Assistance: It's strongly recommended to involve a licensed pest control professional with experience in pre-construction termite treatments. They can ensure the correct application of chemicals and the proper execution of all steps.


Remember that termite treatment is an ongoing process. Regular inspections and preventive measures are key to maintaining a termite-free environment for your new home.


18 views0 comments

Recent Posts

See All

Comments


bottom of page